You are here

January 2017

15-01-2017 - 00:00
We installed a brand new drying installation. Delivered by Gröninger.This dryer is capable in drying 2 tankers at the same time using hot or cold air.As a result of this, the lead time is reduced severely. 
01-01-2017 - 00:00
In our cleaning are multiple changes implemented, such as a brand new floor coating.But first we made new wastewater collection pits. Through these pits we are able to separate solid from liquid in an early stadium.After that we finished the work floor with a brand new Epoxy coating.Resulting in a... Lees meer